DTU P 06-002 PDF

Snow and Wind 65 rules defining the effects of snow and wind on constructions; The Eurocodes; The DTU P (code of practice for building work) of. Avec la norme homologuée NF DTU P, d’avril , remplace la norme .. neige et du vent sur les constructions et annexes (référence DTU P ). Refer to standards (DTU P //; NP EN ; NP EN ; NP EN ; DTU and ; DTU ) and to a ceramic tile.

Author: Kesho Yozshut
Country: Nepal
Language: English (Spanish)
Genre: Relationship
Published (Last): 22 December 2005
Pages: 68
PDF File Size: 12.15 Mb
ePub File Size: 20.87 Mb
ISBN: 814-1-42748-522-6
Downloads: 21288
Price: Free* [*Free Regsitration Required]
Uploader: Miktilar

The NF P standards or the NV 65 rules define the effects which snow and wind can have on constructions.

PVC panels are made up of polyvinyl chloride and have an anti UV-ray treatment in the main body hence efficient on both sides. Smoke always accumulates in the higher parts of a building and the smoke evacuation therefore always occurs off:.

– Google Drive

This news release was prepared by Martin Demers P. Aluminium et alliages d’aluminium – NF A View Ideas submitted by the community. However, forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information.

Diamond drill holes were drilled with NQ-size core in order to obtain larger sample volumes of the mineralised zones, except for holes that traversed underground workings which were completed using BQ-size core.

The U coefficient is increasingly used to measure the performance of roofing materials than the R coefficient or others. One drill rig was assigned to holes that required traversing the Marban mine underground workings, located between and metres vertical depth, in order to investigate the prospective shear zone located along the footwall south contact of the Mine Sequence. Resistant to corrosion acids, grease, detergents…they also resist to temperature changes.

  ESAP IN ZIMBABWE PDF

PVC has a high value for money and has an excellent resistance to fire rating M1. For Dhaze profiles with tightening bonnets, we recommend one screw every 30cm for all polycarbonate thicknesses 16mm, 32mm or 55mm.

Outlook A third drill rig is to be added by the end of January to carry out 5, metres of shallow drilling at the Norlartic dut. M0 ” incombustible ” M1 ” non inflammable ” M2 ” hardly inflammable ” M3 ” mildly inflammable ” M4 ” easily inflammable” M5 ” very easily inflammable” These standards are progressively being replaced by European Standards — for construction products, these classifications are: The results for the remaining 18 completed drill holes are pending.

The core was photographed for reference, logged and mineralised sections were sawed in half. The joules standard certifies that roofing material will resist a 70Kg object falling from a 1 metre height. In France, there is a fire-resistance classification which defines 6 categories for materials:. The forward-looking information contained in this news release is made as of the date of this news release.

Learn more

Bois dtj NF B However, polyester is less clear and transmits lights less efficiently than Polycarbonate of PVC. For further information, contact. The objectives of the program are to increase the quantity and quality of the existing mineral resource. Specifically, this news release contains forward-looking information with respect to future exploration work on the Marban Block property.

  EASY TO BUILD WIFI 2.4GHZ YAGI ANTENNA PDF

Here is an example of a test on one of our skylights, one minute after we dropped a bag on top — the tests show the bag did not go through the skylight. Back to main menu.

For Dhaze profiles with tightening bonnets, we recommend one screw every 30cm for all polycarbonate thicknesses 16mm, 32mm or 55mm Steel plate roofs: As well, pulps grading above 0. Reported intervals are in core lengths but are anticipated to approximate true widths, except where structural complexities occur, as the holes were drilled perpendicular to the principal local structural orientation.

Samples were assayed by the fire-assay method using an atomic absorption finish on a gram pulp split. Reviewing applications can be fun and only takes a few minutes.

Marban Deposit Drilling The initial phase of the program is intended to complete the drill hole pattern on a 50 metre spacing to a vertical depth of metres. Overlap is the transversal overlap between two insulated steel plates or two multi-skin polycarbonate plates.

The first year program under the terms of the Aurizon option agreement 0-6002 Niogold includes 50, metres of diamond drilling mainly directed at better defining and increasing the near surface mineral resources at the Marban and Norlartic gold deposits.

The most used coefficients are R thermal resistance and U surface thermal transmission: These standards are progressively being replaced by European Standards — for construction products, these classifications are:.